Pages

Thursday, April 29, 2010

Finishing the Basement - and adding some fun

For as long as we have lived here half of the basement has gone unfinished. It has been our washroom, utility room, and general junk storage room. Well this has come to an end! In order to do some other changes to the house in the future (Remodel the main bathroom) we had to move the entrance to the crawl space from the half bath downstairs in order to put a shower downstairs, in order to move the entrance to the crawl space the washer and dryer had to be moved along with their plumbing/electrical and a new door to the crawl space installed. I figured if I am moving them I should just finish as much of the basement as possible as long as it didn't interfere with the plumbing to the upstairs bathroom that I still needed access to so that it can be changed later, And then I added a bouldering wall for those days that I don't want to go to the gym and can't get out into the real world as well cold sucks. Now for some pics to give you an Idea of where it came from to where it is now :)












It is currently a bit of a mess and needs things put away but it is 99.999% done just some touchups left to do.



No comments: